Publiée le 29 sept. 2026 · Nous l'avons confirmé au moment où cette offre a été agrégée
Cette entreprise est la vôtre ?₹ 1.500 – ₹ 12.500 par projet
I have completed the construction of a residential house in Kerala with a built-up area of approximately 1,500 sq.ft. and now require a **detailed, item-wise Bill of Quantities (BOQ)** covering the complete construction. The BOQ must: * Cover **all stages of construction**, from site preparation, earthwork and foundations through RCC structural works, masonry, roofing, waterproofing, flooring, doors and windows, electrical, plumbing, sanitary installations, painting, external works and final cleaning/handover. * Reflect the **actual materials used at site**, including brick/block masonry, cement, sand, aggregate, concrete, reinforcement steel, tiles, wood, glass, aluminium/uPVC, plumbing materials, electrical materials, sanitaryware, paint and other applicable items. * Record **brand names, material specifications, sizes, grades and quantities** wherever they are available from site records, purchase details, drawings, schedules or photographs. * Include the **calculated number of bricks/blocks**, mortar consumption and other measurable material quantities wherever these can be reliably derived. * List every measurable work item with: **Sl. No. | Work Description | Detailed Specification | Material/Brand | Unit | Quantity | Material Rate | Material Amount | Labour Rate | Labour Amount | Total Rate | Total Amount | Remarks/Source** * Use **market-realistic Kerala rates** for the relevant construction period and clearly distinguish between material cost and labour cost. * Calculate the **total amount for every work item, section subtotal and final grand total**. * Follow a **Kerala PWD-style BOQ format**, using CPWD-style measurement principles where appropriate, so that the document can also be used as a reference for future variations, contractor reconciliation and bank/property valuation. * Clearly separate **actual measured quantities** from **estimated/provisional quantities** where exact information is not available. * Include a **variation/additional-work section** so that future changes can be compared against the original BOQ. * Maintain complete **traceability**: every quantity should, wherever possible, be linked to a dimension or measurement from the architectural/structural drawing, schedule, site measurement, purchase record or site photograph. * If any required information is missing, **flag it before completing the final quantity take-off** rather than assuming a value without clearly identifying it as an assumption. * Include a **BOQ assumptions and exclusions section** explaining anything that could not be verified from the available documents. Required deliverables 1. Editable Excel BOQ workbook * Detailed item-wise BOQ * Material and labour cost separation * Section-wise subtotals * Grand total * Quantity calculations * Rate analysis where required * Assumptions, exclusions and variation sheets * Source/traceability reference for each major quantity 2. Ready-to-print PDF BOQ summary * Project details * Section-wise quantities and costs * Material/labour cost summary * Grand total * Major specifications * Assumptions and exclusions I will provide the architectural drawings, structural drawings, schedules, specifications, site measurements, purchase/material records and site photographs** as available. Accuracy and clarity are the priorities. **Do not invent missing quantities, brands or rates. Flag missing information early, identify assumptions clearly, and ensure that every measurable quantity is traceable to a drawing dimension, schedule, site measurement or supporting record wherever possible.
Créez un compte gratuit pour voir l'offre complète et postuler.