Pubblicata il 21 nov 2026 · Abbiamo verificato il 21 nov 2026 che è ancora attiva
Questa azienda è tua?AU$ 5.000 – AU$ 10.000 per progetto
Title: Aircraft structural engineer: welded 4130 STOL frame, full design package (paid trial first) Budget: AUD $4,000–10,000 total, paid by milestone Description: I’m building one two-seat STOL taildragger (600 kg MTOW, amateur-built, Australia, 19-series approval). It has a welded 4130 tube fuselage, a strut-braced wing, a 7075 aluminum spring gear bar and fabric covering. The layout is modelled in CAD and I have a first-pass beam analysis, a weights and CG ledger, a fittings schedule and a control system sheet. I need an experienced aircraft structural engineer to take it from layout to build-ready design. This is a staged job, paid per milestone. You can be paid for stage 1 and stop there, and so can I. Stages Paid trial (AUD $100–250, fixed): design and check the lift-strut lower lug at the fuselage hoop. Deliver a one-page hand calculation (double shear, bearing, bypass, bolt bending, lug tear-out, tube and weld check, margins of safety), a simple fabrication drawing, and a short note on any assumptions or load problems you find. Structural review and tube sizing: frame, wing, gear and tail. Fixed price quoted after stage 1. Fittings and control systems: wing root and strut fittings, gear saddle, engine mount, hinges, stick, pedals, cables, pushrods, pulleys, trim and flaps. Fixed price quoted after stage 2. Fabrication drawings and approval documents: weld jig drawings, parts and hardware list, and stress documentation for RA-Aus 19-series approval. Fixed price quoted after stage 3. The full job is intended for the stage 1 winner, subject to the quality of their work. I can end the contract after any stage. All drawings, calculations and source files are mine. You must include in your bid (bids without these will not be considered): The name or type of an aircraft you have analysed or designed. Whether you have worked on welded 4130 tube structures. 2–3 sentences: how do you account for weld heat-affected zones and joint efficiency when sizing a 4130 cluster joint? Who signs your calculations, with their qualification, and what standard you work to (FAA, EASA, RA-Aus, other). A redacted page from a stress report or a drawing from past aircraft work. I’ll supply: a one-page trial brief with loads and geometry. After the trial, the CAD/STEP model, the beam screening report and the design brief. Not wanted: generic bids, 3D modelling or rendering only, and anyone who can’t take responsibility for their structural calculations.
Crea un account gratuito per vedere l'offerta completa e candidarti.