发布于 2026年11月20日 · 我们于 2026年11月20日 确认该职位仍然有效
这是您的公司吗?₹ 600 – ₹ 1.500 (每个项目)
I need a fast, professional cost estimate for a full-scope MEP turnkey package on a new-build extension. The estimate must cover Mechanical, Electrical, Plumbing, and Fire-fighting systems, broken down by discipline and trade so I can see labor, material, equipment, and contingency allowances at a glance. Scope to include • Complete bill of quantities with unit rates • Material take-offs from my drawings (AutoCAD/Revit files) • Line-item costing—including HVAC, power, lighting, low-current, water, drainage, pumps, sprinklers, controls • Summary sheet showing total CAPEX and % for prelims, overheads, and profit Please base pricing on current market rates and flag any cost assumptions clearly. A brief written methodology and an editable Excel workbook are part of the deliverable so I can update figures later if needed. Time is critical—my target is to review your first draft within a few days, with a final version signed off shortly after. Let me know your typical turnaround and any information you still require from me to get started right away.