arrow_back 返回自由职业
F

Convert PowerBI Dashboard 2026→2023

Freelancer

分享:
placeSG home_work远程 assignment合同制 public聚合职位 · SG

event发布于 2026年9月25日 · verified我们于 2026年9月25日 确认该职位仍然有效

这是您的公司吗?

SGD 30 – SGD 250 (每个项目)

职位介绍

I already have a fully-working Power BI dashboard that was built in the 2026 desktop release, but my company laptops are locked to the 2023 version. The data models are fine; what fails to open are the visualizations themselves. I can provide the existing .pbix file as well as all of the original data sources—every connection still resolves without issue in 2023. Your task is to rebuild the visual layer in a clean Power BI Desktop 2023 file so that it mirrors the current layout, filters, themes, and interactions exactly. All measures, DAX calculations, and formatting applied in 2026 need to render identically in 2023 without relying on preview or deprecated features. Deliverables • A 2023-compatible .pbix containing the replicated visualizations • Brief notes outlining any feature substitutions or work-arounds used • A quick walkthrough (screenshots or short video) proving the file opens and functions in Power BI Desktop 2023 I will test the file on my office laptop; payment is released once everything loads error-free and matches the original look and behavior.

继续免费阅读

创建免费账户以查看完整职位信息并申请。

  • badge作品集对企业可见
  • notifications新职位邮件提醒
  • favorite始终免费,无任何隐藏条件