发布于 2026年11月17日 · 我们于 2026年11月17日 确认该职位仍然有效
这是您的公司吗?US$ 10 – US$ 30 (每个项目)
The structural plans for a new house / home addition here in New Hampshire are already complete. Local officials will accept the set once they receive a brief engineer’s letter carrying a valid New Hampshire PE stamp that references those drawings. Scope I do not need any redesign or additional calculations—just the stamped letter confirming that the submitted plans comply with applicable NH building codes. The drawings themselves can be shared as a PDF for your quick review before you issue the letter. Deliverables • One signed and dated engineer’s letter in PDF format bearing your New Hampshire PE stamp and license number • Any supplemental form the building department may require (if applicable) Let me know your turnaround time and anything else you need from me to release the stamp.