arrow_back العودة إلى الأعمال الحرة
F

Construction Gantt Schedule in MS Project

Freelancer

مشاركة:
placeGB home_workعن بُعد assignmentبعقد publicوظيفة مجمّعة · GB

eventنُشرت في 23 نوفمبر 2026 · verifiedتحققنا في 24 نوفمبر 2026 من أنها ما زالت متاحة

هل هذه شركتك؟

£ 10 – £ 15 / لكل مشروع

عن الوظيفة

I need a clear, phase-level construction schedule built in Microsoft Project and exported as an easy-to-read Gantt chart. The plan should focus only on the four main stages I’ll provide—site preparation, foundation, structure and finishes—rather than drilling down into daily activities. For each phase I already have a rough duration in days or weeks; your task is to place those durations on the timeline, link the phases with sensible dependencies, and let MS Project calculate the critical path and overall project length. Please use a standard 5-day work calendar unless you see a reason to suggest otherwise, and keep the layout tidy with colour-coded summary bars so stakeholders can grasp progress at a glance. Deliverables • Editable .mpp file with properly named phases, start/finish dates and dependency relationships • One-page PDF or image of the Gantt chart suitable for presentations If anything about the durations or sequencing seems unrealistic, flag it and propose an adjustment—I’d rather catch issues now than on-site. This will be a one off project possibly leading to more when I have tenders to supply timelines in the future.

تابع القراءة مجانًا

أنشئ حسابًا مجانيًا لعرض الوظيفة كاملة والتقديم عليها.

  • badgeملف مرئي للشركات
  • notificationsتنبيه بالوظائف الجديدة عبر البريد الإلكتروني
  • favoriteاشتراك مجاني، يمكنك الإلغاء في أي وقت