2026年10月19日に公開 · 2026年10月19日時点で募集中であることを確認済みです
この企業はあなたの会社ですか?US$ 1.500 – US$ 3.000 /案件
We remodeled a Trader Joe's in San Jose and used 2 bus taps in the process. Because of that, the inspector is requesting a fault current coordination study. The main incoming service is rated at 65K AIC. The study must be performed and reported by an electrical engineer and include all pertinent evaluation data and methods of collection. It should detail panels, services, breakers, fuses, and equipment downstream from the main service gear. Single-line drawings, photos, or other technical information can be provided as needed.
無料アカウントを作成すると、求人の全文を見て応募できます。