arrow_back Back to freelances
F

UK SuDS Report & Strategy

Freelancer

Share:
placeGB home_workRemote assignmentContract publicAggregated job · GB

eventPublished on Nov 24, 2026 · verifiedWe confirmed on Nov 24, 2026 that it's still live

Is this your business?

£ 250 – £ 750 per project

About the job

I’m preparing a planning application for a small housing development in the UK and need a full Sustainable Drainage System (SuDS) package produced from scratch. No drainage data has been gathered on the site yet, so you will be starting with a blank slate and guiding what investigations are necessary. The job covers: • A compliant SuDS strategy and written report suitable for submission to the Local Planning Authority / LLFA • All hydraulic calculations (MicroDrainage, Causeway Flow or equivalent) and supporting evidence • The council-issue pro-forma Excel sheet, fully completed • Clear drawings showing proposed pipework, attenuation, outfall and exceedance routes in PDF and DWG/PDF formats Acceptance criteria: – Report and pro-forma must reference the latest CIRIA C753 guidance and local policy. – Allow for both infiltration-led and restricted-discharge options, justifying the preferred solution. – Outputs must be ready for direct upload to the planning portal without further editing. If you’ve recently delivered SuDS documents for UK housing schemes and can turn them round quickly, I’d like to hear how soon you can start and the information you will need from me first.

Keep reading for free

Create a free account to see the full job and apply.

  • badgePortfolio visible to companies
  • notificationsNew job alert by email
  • favoriteFree subscription, cancel at any time