Published on Oct 19, 2026 · We confirmed on Oct 19, 2026 that it's still live
Is this your business?US$ 1.500 – US$ 3.000 per project
We remodeled a Trader Joe's in San Jose and used 2 bus taps in the process. Because of that, the inspector is requesting a fault current coordination study. The main incoming service is rated at 65K AIC. The study must be performed and reported by an electrical engineer and include all pertinent evaluation data and methods of collection. It should detail panels, services, breakers, fuses, and equipment downstream from the main service gear. Single-line drawings, photos, or other technical information can be provided as needed.
Create a free account to see the full job and apply.