arrow_back フリーランスに戻る
F

Update Chart Component for History Overview

Freelancer

シェア:
placeVN home_workリモート assignment契約社員 public集約求人 · VN

event2026年9月17日に公開 · verified2026年9月18日時点で募集中であることを確認済みです

この企業はあなたの会社ですか?

US$ 2 – US$ 8 /案件

求人について

I need a developer to update an existing chart component that displays a “Full History Overview.” Currently, the overview graph displays all historical data points at once. I want users to control how many points are visible.

Requirements

* Add a setting called “Maximum visible points.” * Allow the user to enter or select the number of points displayed at one time. * The default setting must continue to show the full history. * If a limit is configured, display only that number of points within the visible graph area. * Add a horizontal scrollbar or slider so the user can navigate through the complete history. * The main chart and overview/window-position controls must remain synchronized. * Preserve the existing chart design, tooltips, peak/low indicators, colors, and responsive behavior. * Validate the setting: only positive whole numbers should be accepted. * If the configured limit exceeds the available data, show all available points. * Save the selected setting so it remains after refreshing or reopening the application. * The implementation must work smoothly with large datasets. Deliverables: * Updated source code * Responsive and working chart behavior * No regression in existing chart features * Short explanation of the changes * Testing instructions Please mention which chart library or component you have experience with and provide an estimated delivery time.

このまま無料で続きを読む

無料アカウントを作成すると、求人の全文を見て応募できます。

  • badge企業からポートフォリオが見える
  • notifications新着求人をメールでお知らせ
  • favorite常に無料、追加料金なし